What If Construction Costs Increase?
Contingency reserves — often around 5–10% of the build budget — cover some overruns, but costs can still exceed what the loan allows. Beyond contingency, you usually pay the difference in cash or must restructure the loan, which is not always possible. Ryan & Steve stress realistic budgets before closing.